Two power wires do not necessarily provide two independent supplies. If they share a battery connector, converter or vulnerable return path, one fault may still remove both. A useful redundant-power design starts by tracing energy from its source to every function that must remain available.

Embention’s R12F, R24F and R12S products provide conversion and power-management functions within that architecture. They are components to specify deliberately, rather than a complete redundancy solution on their own.
Draw the paths all the way to the load
Include energy sources, protection, switches, converters, connectors, wiring and returns. Mark which elements are shared. Then ask what remains powered when each relevant element becomes unavailable or behaves incorrectly.
An illustrative arrangement with two batteries feeding one common converter may tolerate loss of one battery under the intended conditions, yet still depend on that converter. A second downstream cable does not change the shared conversion point.
The required response should be explicit. Continuing all functions indefinitely is different from keeping essential avionics alive long enough to execute a defined recovery. That distinction affects energy capacity, load priorities and the architecture itself.
Choose conversion from the actual load schedule
The reviewed R12F manual specifies a 12 V output with a maximum output current of 5 A. R24F provides 24 V with a maximum output current of 2.5 A. Both manuals list a 14–160 V DC input range. These are product limits to review alongside operating conditions and the exact version supplied.
R12S has a different role and input range. Its reviewed manual describes selectable outputs and switching functions, with a 5.5–36 V input range. It should not be substituted for an R12F or R24F simply because the required output voltage appears in its options.
List simultaneous loads, start-up demand and transient behaviour. Include peripherals that may remain active during a recovery, such as communications equipment. A budget based only on the autopilot’s normal consumption can miss a critical dependency.
Test the transfer, not just the steady states
A system can work perfectly from supply A and perfectly from supply B, yet reset during the transition between them. The verification plan should observe the relevant rails and consuming equipment during loss, recovery and the defined fault conditions.
Agree acceptable interruption, voltage excursion and restart behaviour with the equipment requirements. Check what the software records and what the operator sees. A brief reset that is easy to miss on a voltmeter can have a significant effect on system behaviour.
Temperature and installation also belong in the assessment. Converter performance depends on its thermal conditions, and an enclosure or OEM version may impose different mechanical integration responsibilities.
UK Supply & Technical Enquiries
Torquety represents Embention in the United Kingdom and imports, distributes and sells its avionics hardware, including the relevant power-conversion products. Share the power diagram, source voltage envelope, load schedule, required surviving functions and verification expectations.
Ask Torquety to assess the power components for your avionics architecture. A useful quotation identifies the exact converters and variants, while preserving the distinction between their individual ratings and the redundant behaviour that the complete aircraft must demonstrate.